Category: Building & Grounds
-

Work on the painting project has begun. Monday, May 4, 2026
Starting from the top. Well, the front was power washed last week so It was the first step. View from the steeple on a very windy day.
-

Sam and Stefan took down storm damaged tree getting ready for painting.
-
Rear wall Sanctuary gets new shingles.
They were very tired old shingles that came off easily.Seth Gauley did the wall around the corner a few years ago and returned to tackle this high wall.Shingle by shingle the wall turned gold.Finished Wednesday practically in the dark.Thank you, Seth. The photographs don’t quite capture how high that peak is.
-
A Saturday Afternoon fix
How lucky the church is to have this guy in the neighborhood. He understands pipes and, with a little felt from the Sunday school room, can stop an annoying rattle when the low G vibrates a large case pipe.Bob Hungerford, our hero. And Claire Ganz’s super extension step ladder. Thank you both.
-
NEW SHINGLES ON CHURCH
Work by Seth Gauley. Before: Shingles falling off wall. Wrinkled surface. The back is yet to be done but looks the same. Close up of stripped wall. Antique horizontal boards. SHINGLES STRIPPED HORIZONTAL SIDING “Tyvek” applied NEW SHINGLES, READY TO PAINT.
-
Painting the Parsonage
December 23, 2015: Doug Shine has finished stripping and patching the upstairs. Is starting on downstairs. Prime and paint to come. The Parsonage will be fresh and clean for what comes in June.
-
Steeple and Cross Repair Completed
Steeple repaired, scraped and painted. No leaks! Cross gilded and reattached to top of spire with new bracket. Below are photographs of the cross being replaced. New base of cross. Steeple repaired, scraped and painted. New wood on bell chamber and roof at base sealed. Cross repaired and new bracket constructed to replace it on…
-
Steeple and Cross Repairs begin
September 8 at 7:30 Francis Allard and John Leecock arrived to begin work on steeple restoration. Remember Lia Kahler’s concert “Spirit Song” on Sunday at 3 to raise funds for this project. The riggers access the roof. Frank shows John the cross. They will take it home with them for repairs. Francis Allard measures for…
